Webinar on-demand.

Structuring data at the jobsite level is what drives the predictability of your projects. Hear from George Hunt, CM-Lean, PSP, and a panel of LPS experts as they take a pragmatic approach to put data first and how digitizing your planning process can improve project certainty.

You will learn:

What You'll Learn:
  • How teams can minimize variation and avoid costly "stops and starts."
  • The importance of PPC and how to implement its use on the jobsite.
  • How to easily diagnose bottlenecks that cause variances in the schedule.
  • How using a collaborative construction planning tool improves overall project predictability.

Why it Matters:
  • 98% of construction projects suffer cost overruns in excess of 30%
  • 77% of construction projects are late at least 40% of the time
  • 82% of owners cite the need for better collaboration with their contractors
  • Rework typically results in a 9.82% schedule growth
  • 52% of project-related rework is caused by poor project data and miscommunication
  • Up to 30% of initial data created during design and construction is LOST by project closeout

Host:
George Hunt, CM-Lean, PSP

Panelists:
Melanie Gilbertson, Director of Production Support at Flintco, LLC

Layne Hess, Corporate Director of Scheduling and planning for Jacobsen Construction

Corrie Neuens, Sr. Project Manager at The Boldt Company

Adam Hoots, Lean Shepherd at Construction ACHE Solutions

Felipe Engineer-Manriquez, CEO & Host of The EBFC Show